New switch gear and feeders were installed to supply an upgraded cooling system at the IEUA Central Treatment Plant in Chino, CA. This installation facilitated efficient power delivery to lighting and pump motor loads as well as a number of motor operated valves.
Having a big sale, on-site celebrity, or other event? Be sure to announce it so everybody knows and gets excited about it.
Nearly 70 marina grade power pedestals, as well as all the conduit, cables, transformers and switching equipment to supply them, were installed at this historic camp site in Yermo, CA.
This treatment plant required the retrofit of a new NaCIO injection system. This included corrosion resistant raceways boxes and mounting systems, as well as new power conductors and panels to supply lighting, sump pumps, motor actuated valves and NaCIO metering pumps along with the associated instrumentation. Additionally, new control conductors were required from the existing PLC to the various pumps, valves and control and measurement devices.
Copyright © 2021 GJR Electric - All Rights Reserved.
Powered by GoDaddy Website Builder